A "No" to Selling Isn't a "Yes" to Spending
Soon the Board will ask SCOV homeowners to approve spending on the Copper Center. It’s the first and largest piece of what the Board calls the “Community Spaces Initiative,” a plan involving the Copper Center, the Artisan Center, the Welcome Center, and Golf Operations. Only the Copper Center will be on the ballot. The Board has said the other remodels would be paid from the asset reserve fund.
In his President’s Statement at the September board meeting, the HOA president laid out the case for it. His argument boils down to this: owners already gave the Board a mandate, the Board now has a legal and fiduciary duty to remodel the building fully, and the only question left is whether owners will let the Board spend enough to “do it right.”
That argument doesn’t hold up well under a closer look. The statement leans on the 2024 vote to sell the Copper Center, which failed 692 to 1,246. It calls that result “a direct instruction to the Board: keep the building and make it work for us.” But the ballot asked one thing: should the association sell? People voted no for all kinds of reasons. Some didn’t want to take a loss so soon after buying. Some thought the timing was wrong. Some wanted more information first. Some liked the idea of an artisan center but not at any price. Deciding not to sell isn’t the same as signing a blank check.
What the statement doesn’t mention is that owners have already voted on spending. In April 2025, the Board asked for authority to spend up to $3 million on the Copper Center, and it failed. A $1,000 assessment failed with 60% voting no, and a higher capital contribution fee didn’t reach the two-thirds approval required.
The statement also says buying the building created “a clear fiduciary and legal obligation under our governing documents and Arizona state law” to remodel it. That’s a big claim. If a section of the governing documents or a state statute requires a remodel of a particular size, owners should be shown exactly where it is. Generally, a board’s fiduciary duty is to be careful and prudent with owners’ money. Owning a building doesn’t by itself require spending whatever it takes to build it out, and caution seems like the more responsible course when owners have already said no.
The 10% spending limit gets called “an arbitrary cap.” It isn’t arbitrary. It’s in the governing documents so the Board has to come to owners before spending big money. It’s doing exactly what it was meant to do.
Owners are also told the only choices are a “bargain-basement build” or a full remodel. There’s plenty of room in between. It could size the project to actual membership and usage. Clubs could contribute toward specialized equipment. Doing a project responsibly doesn’t mean doing it cheaply.
As for “no special assessment,” that’s good to hear, but it isn’t the whole picture. The Board can raise dues by up to 15% a year without a vote of the owners. So the absence of a special assessment doesn’t mean owners won’t end up paying more. And a building like this comes with ongoing costs for staffing, utilities, insurance, and upkeep that will show up in budgets for years.
The pool heater comparison doesn’t really fit either. That was replacing failed equipment at a pool many residents use, paid from reserves set aside for that purpose. Building out a new specialty facility is a different kind of decision. If the pool heaters taught anything, it’s to get the specs and estimates right before spending.
None of this is about opposing the artisans. Many residents value the clubs and the people in them. The bigger concern is what gets pushed aside. The capital fund takes in roughly $800,000 a year, and it has to cover every major need in the community. If the Copper Center goes to the front of the line, other projects wait. Owners deserve to know which ones: pools, aging equipment, or anything else that’s been planned. That trade-off hasn’t been part of the conversation.
Owners are also being shown only one path, the full build-out. Lower-cost options don’t appear to have been seriously considered, even though a phased or scaled-down plan could leave room for other priorities. Owners should also be shown the specific provisions the Board says require a full remodel.
Until then, there’s no mandate to spend. There’s a community that has voted for caution more than once, and a Board that ought to respect that.
A new name. Same question.